June 9, 2010
Construction Update June 10, 2010
The front of Village of Hope. The cement floor in the basement has been installed and the floor/ceiling joists are in place. The earth is being compacted in the rest of the building. Once that is completed the in-floor heating coils will be placed and the slab will be poured.
Compacting the fill inside of the building in preparation for the slab on grade.
The sidewalk in front of the facility on Mississippi got a facelift this week.